toto togel 4d situs toto togel situs togel slot deposit pulsa slot gacor 4d data keluaran hk

Raj. State Electricity Board & Anr. vs. vs. LRs. of Kishan Chand

26.00 2.60

Guaranteed Safe Checkout
Spread the knowledge

Code of Civil Procedure, 1908–Sec.100–Second appeal–Scope–Suit for permanent and mandatory injunction was decreed–Appreciation of–Courts below appreciated the evidence and concluded that the electric meter was defective–Consistant consumption of electricity after change of meter–Respondent-petitioner failed to show that the meter remained in sealed condition till reaching to Electric Inspector–Held, no scope is made out for interference.