toto togel 4d situs toto togel situs togel slot deposit pulsa slot gacor 4d data keluaran hk

GMG Engineering Industries (M/s.) & Ors. vs. M/s. Issa Green Power Solution & Ors. (SC)

32.00 3.20

Guaranteed Safe Checkout
Spread the knowledge

Limitation Act, 1963–Sec. 5–Sufficient cause–Liberal construction should be given to advance the substantial justice–Delay should be condoned if there is no negligence, inaction or want of bonafide is imputable to the appellants–Discretion is not to be exercised in any arbitrary, vague or fanciful manner–True test is to see whether the applicant has acted with due diligence.